WEEK 9

Project name: Color Sensation Device

Date: 4/12/2021

Team members: William Chamoun*, Malik Turner, Rhandi Whitlow, Hao Wu, Yi Yu

Presenter: No Presenter

Marble Surface

Updated Gantt Chart

Picture1.png
Marble Surface

Work Breakdown Structure

Picture5.png
Marble Surface

Accomplishments since last status report:

  • Tested H-Bridge and 12V Battery functionality and specifications.

  • Tested device functionality and specifications.

  • Finished the device dimensions (18”x10”x10”).

  • Conducted tenth team meeting. 

  • Updated project’s website and timeline.

  • Made revisions to the proposal draft.

Obstacles encountered since last status report:

  • Power consumption for cooling modules.

  • Current direction control.

Marble Surface

Risks facing the project:

​

  • Device malfunction.

Objectives for the next week:

  • Order 4-diode biasing circuit (H-bridge) with higher AMP allowance.

  • Test more heatsinks and fans.

  • Test new materials and develop more code. 

  • Look into adding elements to the circuit for faster temperature change.

Comments: NA